Monday, November 17, 2008

Job Change (one year later)

My timing in my job change was great and I moved from timber wright using chisels for mortise and tenon work to timber wright using AutoCad to draw our frames. I spend a lot of time doing preliminary designs for potential clients, but occasionally I get to draw all the way to the finish...

This is the second frame that I drew. It has a valley system in the great room that sped up my balding - unfortunately, compound joinery was not covered in my English classes at KSU.






This was my first frame. A barn with straight-forward joinery. I wish I got to live in something as nice as these horses are getting.


1 comment:

tubby said...

those legs look way to skinny to be you up there on that frame installing the signature symbol to begin the celebration phase